South Carolina Residential Specialty Contractor Plumbing Exam Exam Prep
Free practice questions

Free SC-RSC-PL Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The SC-RSC-PL exam has 65 questions and runs 3 hours.

These 10 free SC-RSC-PL questions are organized by exam domain, so you can see how each part of the South Carolina Residential Specialty Contractor Plumbing Exam blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: General Plumbing Knowledge and Regulations

Question 1

A water-distribution line is being sized for a specified design flow. At the service connection, upstream of the meter and backflow assembly, static pressure is 76 psi; pressure while supplying the design flow is 48 psi. The highest outlet is 30 ft above that connection and requires at least 20 psi residual pressure. The meter and backflow assembly together lose 6 psi at design flow. Calculated pipe-and-fitting losses are 18 psi for 1/2-inch pipe, 6 psi for 3/4-inch, 2 psi for 1-inch, and 0.8 psi for 1-1/4-inch. Use 0.433 psi per foot of elevation; no other losses apply. What is the smallest listed pipe size that meets the outlet requirement?

Show answer & explanation

Correct answer: B - 3/4 inch

Question 2

An apprentice marks a plumbing bore at midspan in an unnotched, solid-sawn floor joist. The bore is smaller than one-third of the joist's depth, and its edges will be more than 2 inches from both the top and bottom. There are no other holes. A reviewer objects solely because the bore lies in the middle third of the span. Which comment correctly applies the 2018 International Residential Code's prescriptive cutting and boring provisions?

Show answer & explanation

Correct answer: D - The proposed bore complies; the middle-third prohibition applies to notches.

Domain 2: Piping, Valves, and Controls

Question 3

The purchase order specifies nominal 3/4-inch Type L hard-drawn copper water tube. At delivery, the installer checks the outside diameter with a caliper and reads the tube's identification color. Which combination matches the order exactly?

Show answer & explanation

Correct answer: A - 7/8-inch outside diameter with blue identification

Domain 3: Fixtures and Equipment

Question 4

An owner wants a new shower to use a conventional two-handle mixing valve because an ASSE 1017 master mixing valve already limits the hot-water distribution temperature to 118 degrees F. The project follows the 2021 International Plumbing Code. Which installation satisfies the individual shower-valve requirement?

Show answer & explanation

Correct answer: D - Install an ASSE 1016 shower valve rated for the showerhead's flow, with its limit stop adjusted to 118 degrees F.

Domain 4: Water Supply

Question 5

After a check valve is added at a home's water meter, a gauge downstream reads 62 psi when the storage water heater is cool and gradually rises to 108 psi during reheating with all fixtures closed. An upstream gauge stays at 62 psi. Briefly opening a faucet returns the downstream pressure to 62 psi. The heater's temperature control operates normally, and no thermal-expansion device is installed. Which change addresses the cause rather than the symptom?

Show answer & explanation

Correct answer: B - Add a properly sized potable-water expansion tank on the heater's cold supply, downstream of the check valve.

Domain 5: Drain, Waste and Vent and Sewers

Question 6

A bathroom addition has a correctly sized horizontal wet vent serving a lavatory, shower, and water closet on one floor. A kitchen sink has its own dry vent, but its drain has been connected between the lavatory connection and the most downstream bathroom fixture connection. Under the 2021 International Plumbing Code, what revision preserves the bathroom's horizontal wet-vent arrangement?

Show answer & explanation

Correct answer: D - Reconnect the kitchen drain downstream of the entire wet-vented section.

Question 7

A 2-inch horizontal kitchen branch must join a 3-inch horizontal drain at a right angle and direct its discharge downstream. Both pipe axes must remain horizontal through the junction. For this connection under the 2021 International Plumbing Code, which single fitting provides the required change in direction?

Show answer & explanation

Correct answer: B - A combination wye and one-eighth bend

Domain 6: Isometric Analysis

Question 8

In this drainage isometric, flow follows A to B to C to D to E. L connects at A, K at B, WC at C, and T at E. All fixture vents are compliant and omitted. L ---> A \ K ------> B \ WC --------> C ---- D ---- E ---> building drain / T ----------------------/ L is a lavatory rated 1 drainage fixture unit (DFU); K is a kitchen sink rated 2 DFU; WC is a water closet rated 3 DFU with a required 3-inch fixture drain; T is a laundry tray rated 2 DFU. Segment C-D is a horizontal fixture branch. The 2021 International Plumbing Code permits 6 DFU on a 2-inch horizontal branch and 20 DFU on a 3-inch branch. What load and minimum pipe size belong on C-D?

Show answer & explanation

Correct answer: A - 6 DFU; 3-inch pipe

Domain 7: Safety

Question 9

A sewer-replacement crew is working in a 4-ft-6-in-deep soil trench. After rain, the foreman notices fresh cracks at the lip and pieces of soil sloughing from one wall. Spoil is 3 ft back, and a ladder is 10 ft from the workers. The competent person has not reinspected the changed conditions. The foreman's immediate instruction should be:

Show answer & explanation

Correct answer: C - Leave the trench pending the competent person's reassessment and correction of the hazard.

Domain 8: Specialty Applications

Question 10

A 240-volt storage water heater with two 4,500-watt, non-simultaneous elements delivers a short burst of hot water and then turns cold, even after a full recovery period. A qualified technician locks out power, verifies absence of voltage, and disconnects both leads from each element. The service specifications give a normal isolated-element resistance of 12-14 ohms. The upper element reads 12.9 ohms; the lower reads open circuit. Neither element shows continuity to its metal sheath. These findings justify replacing which component?

Show answer & explanation

Correct answer: C - The lower heating element

That's 10 of 1,030

The full bank has 1,020 more SC-RSC-PL questions with explanations.

Continue in the free practice test →

View plans